50 SKY SHADES - World aviation news

Berlin Brandenburg opening “still on track” despite bankruptcy setback

Download: Printable PDF Date: 26 Aug 2015 08:30 (UTC) category:
Publisher:
Berlin Brandenburg opening “still on track” despite bankruptcy setback - Airports / Routes publisher
Tatjana Obrazcova
Source: ATW

Plans to open the much-delayed and controversial Berlin Brandenburg International Airport (BER) in Germany  remain on schedule for the second half of 2017 despite  the bankruptcy of its construction company, Imtech Deutschland, officials said.

BER has issued a statement saying that the airport opening plans will be only minimally affected by the bankruptcy of Imtech, which was announced earlier in August.

BER originally was scheduled to open in October 2011, but that was delayed to May 2012 and then to 2017 following major construction problems and technical issues.

Imtech was contracted to provide electrical work at BER and, alongside Caverion, was a member of the IMCA consortium which was contracted to provide heating, air conditioning, ventilation and sanitation services.

BER said that a taskforce had been established to mitigate the impact of Imtech’s insolvency.

The bankruptcy is just the latest in a long string of problems surrounding the airport’s construction. There were reports of a noticeable reduction in the number of employees at the BER site following the bankruptcy announcement, but Imtech and Caverion have committed to increasing the number of employees as soon as possible.

The taskforce estimates that any overall further delays to BER’s opening will be in the two to three weeks’ range.

Since construction work began in 2006, costs for Germany’s third biggest airport have reportedly almost tripled, from €2 billion ($2.3 billion) to €5.4 billion—excluding costs for ground transportation and traffic connections. When it opens, the airport is projected to be able to handle 27 million passengers.





Recommended

MTU Maintenance secures GE90 engine MRO contract with Garuda Indonesia

MTU Maintenance and Garuda Indonesia have entered into a three-year agreement for the maintenance, repair and overhaul of the airline’s GE90-115B engines, which power its fleet of eight Boeing 7...

Archer announces air taxi networks across Houston, Dallas and Austin

Archer Aviation has unveiled plans to develop three air taxi networks across Austin, Dallas-Fort Worth and Houston, aiming to improve connectivity between major airports, business centers and key regi...

The PC-12 PRO simulator: bringing real-world flight training to life

A professional training device such as the new PC-12 PRO simulator is built on flight data supplied and validated by Pilatus. Drawing on actual flight-test and performance data, it accurately reproduc...

FAA certifies Boeing 737-10, bringing the largest 737 MAX variant to market

The U.S. Federal Aviation Administration has certified the Boeing 737-10, the newest and largest member of the 737 MAX family, paving the way for Boeing [NYSE: BA] to begin customer deliveri...

Android Apps development in Riga, Latvia