50 SKY SHADES - World aviation news

ATR got EASA approval for extension of Type C maintenance visit intervals by 60%

Download: Printable PDF Date: 19 Dec 2021 09:01 (UTC) categories:
Publisher:
ATR got EASA approval for extension of Type C maintenance visit intervals by 60% - Maintenance / Trainings publisher
Tatjana Obrazcova
Country: France Aircraft: Airplanes

ATR has received approval from EASA to extend the intervals between Type C maintenance checks from 5,000 to 8,000 flight hours, for all of its aircraft series. Through this 60% increase in intervals, ATR operators will benefit from a significant reduction in aircraft maintenance costs and increased availability.

David Brigante, ATR’s Senior Vice President Customer Support and Services, commented: “All airlines want their aircraft flying as much as possible, and as their partner all along the way, we are continuously striving to enhance the value of our products. By extending the intervals between these heavy maintenance checks, we offer our operators the potential to generate more revenues, as they will see their aircraft flying up to three more days a year when considering both A and C check improvements now in place. This also reflects the robust maintenance procedures we have in place, and our commitment to placing our customers’ needs at the heart of everything we do.”

With a global fleet of over 1,200 aircraft, flown by 200 operators in 100 countries, ATR is constantly looking for ways to reduce direct maintenance costs and increase revenue potential for its customers. In February 2019, ATR had already received certification from EASA to extend the intervals between Type A maintenance checks from 500 to 750 hours, for all of its aircraft series.

More recently, in November 2021, the manufacturer has set a new standard in operating economics for regional aviation, with the introduction of its new PW127XT engine series as the standard engine for the ATR 72 and 42 aircraft. ATR’s customers will benefit from 40% extended time on wing, bringing the engine overhaul to 20,000 hours, resulting in fewer events over the lifecycle of the aircraft. This will allow a 20% reduction in engine maintenance costs.





Recommended

Gogo secures $7.5 million NOAA contract, providing mission-critical communications services for ‘hurricane hunter’ aircraft

SD Government, a Gogo company serving the military and government markets, announced today that it has secured a multi-year framework contract from the U.S. Department of Commerce's National...

VINCI Airports celebrates the completion of the extension and renovation of Kansai International Airport, as well as the 10th anniversary of the concession

Kansai International airport (KIX) reaches new milestone in its development with the inauguration of the completed international trade zone. This completion marks the conclusion of the extensive renov...

BGS expands fueling partnership with Freebird Airlines ahead of summer 2026 season

Baltic Ground Services, an international provider of ground handling and aircraft fueling services, has expanded its cooperation with Turkish leisure carrier Freebird Airlines across several airports...

dnata wins multi-year Silk Way Group cargo handling contract in Singapore

dnata has secured a new multi-year contract with Silk Way Group to provide cargo and freighter handling services at Singapore Changi Airport (SIN), further strengthening a longstanding global par...

Android Apps development in Riga, Latvia