50 SKY SHADES - World aviation news

Embraer boosts Phenom maintenance to 800 flight hours

Download: Printable PDF Date: 27 Jul 2020 12:11 (UTC) categories:
Publisher:
Embraer boosts Phenom maintenance to 800 flight hours - Maintenance / Trainings publisher
Tatjana Obrazcova
Country: Brazil Aircraft: Airplanes

Embraer announced a revision to the Scheduled Maintenance Requirements (SMR) for the Phenom family of jets. The revision extends the intervals between stops from 600 flight hours and/or 12 months and multiples to 800 flight hours or 12 months and multiples. Most of the tasks with double intervals were also optimized to the longest period. This is a 33% maintenance interval improvement, which is almost double the industry average. To Phenom series customers, this significant improvement equates to less downtime, lower maintenance costs, a long economic life, and more time in the air. The improvement was only made possible by the performance of the Phenom fleet over the last decade. More than one year of engineering analysis confirmed that the customers of these aircraft can fully benefit from the high availability of the fleet for their even better convenience and greater flexibility.

“Conceived as clean-sheet designs to be the best in their respective classes, the Phenom 100 and 300 series aircraft were built for high utilization. Now, eleven years after the first delivery, with a fleet of over 900 jets in operation, our customer support and engineering team can reaffirm, once again, that our products are even better than the initial specification,” said Johann C. Bordais, President & CEO, Embraer Services & Support.

The Phenom fleet has accumulated more than 1.7 million flight hours and 1.4 million cycles since the first delivery of the Phenom 100 in December 2008. Embraer’s business jet operators are supported by a proven global services and support organization and its award-winning network of more than 70 owned and authorized service centers, complemented by a 24/7 Contact Center at its headquarters in Brazil.

The Scheduled Maintenance Requirements for the Phenom jets were developed to meet the specific needs of business aviation and are based on the Maintenance Steering Group (MSG-3) methodology. The methodology aims to preserve and restore the inherent safety and reliability levels of the aircraft and to build a knowledge base for design and maintenance improvement. The main benefits of this methodology include higher aircraft availability and overall cost reduction to keep the aircraft in ideal operating conditions.





Recommended

Daher Aircraft showcases its “go anywhere” Kodiak 900 along with the TBM 960 at France Air Expo

The European tour of Daher Aircraft’s “go-anywhere” Kodiak 900 multi-role airplane continues this week at the France Air Expo 2026 event in Lyon, France, where it will join a fast, e...

Bell announced order of first Bell 407GXi in India with TransBharat Aviation

Bell Textron announced the order of the first Bell 407GXi helicopter in India to TransBharat Aviation Private Limited, one of India’s most established non-scheduled rotary-wing operators. F...

Climate-friendly aviation: greater ambition pays off

Which strategy leads to cost-effective, climate-friendly aviation in 2070? Four scenarios from the Bauhaus Luftfahrt think tank illustrate the impacts of different transformation paths. Key points: In...

VINCI Airports celebrates the completion of the extension and renovation of Kansai International Airport, as well as the 10th anniversary of the concession

Kansai International airport (KIX) reaches new milestone in its development with the inauguration of the completed international trade zone. This completion marks the conclusion of the extensive renov...

Android Apps development in Riga, Latvia