50 SKY SHADES - World aviation news

Muscat International Airport completion by end-2017: minister

Download: Printable PDF Date: 12 Feb 2017 11:33 category:
Publisher:
Muscat International Airport completion by end-2017: minister - Airports / Routes publisher
Krista Kuznecova
Country: Oman Aircraft: Airplanes
Source: Gulfnews

Ahmad Al Futaisi, Minister of Transport and Communications, affirmed on Sunday that 96 per cent of the new Muscat International Airport terminal is completed.

Al Futaisi added that the terminal will be in operation by the end of this year.

The new Muscat International Airport is expected to have a capacity to handle more than 12 million passengers every year and is expected to reach 48 million passengers after completing a number of four-phased construction projects, according to the minister.

The first stage will cover 580,000 square metres and will feature 86 check-in counters, 10 baggage claim belts, 40 gates for both departure and arrival, 29 waiting lounges, 29 aircraft stands with jet-bridges as well as a new control tower.

The new terminal will be able to handle large aircraft such as the Airbus A380 and the Boeing 747. Once the new terminal is complete and becomes fully operational, the existing terminal will be used for low-cost carrier operations.

This was announced during the ministry’s annual media meeting on Sunday.

Image result for Muscat International Airport

Passenger volume at the Muscat International Airport soared 16.6 per cent in 2016, driving numbers up to more than 12.03 million from 10.31 million in 2015, according to the latest data released by the National Centre for Statistics and Information (NCSI).

Compared to 2015, the number of international flights at the airport also went up by 11.6 per cent to 93,822 (46,913 landings and 46,909 take-offs).

There has been an increase of 17.3 per cent in the number of international passengers at more than 11 million, comprising over 5.54 million arrivals, 5.43 million departures and 27,638 transit passengers



Loading comments for Muscat International Airport completion by end-2017: minister...


Recommended

AL172 Simulator successfully installed at BANYUWANGI Pilot School

Alsim is very pleased to announce that an AL172 simulator has been installed at the Banyuwangi Pilot School, East Java, Indonesia. The school signed for it at the end of last year. Dedi...

Waves operates first commercial flight from Europe

Guernsey based airline Waves is celebrating its first ever European flight by carrying French dignitaries from Caen in the nearby La Manche region of Normandy to Guernsey. The group was flown to Guern...

Airbus-built PAZ radar satellite successfully launched

Spain’s first radar satellite will start operations in May 2018 Airbus engineers to support LEOP and IOT phases PAZ will join the Airbus high resolution SAR satellite constellation The...

Impressive start to the year - successful Bombardier Global maintenance by Jet MS

Jet Maintenance Solutions (Jet MS), a global provider of integrated aircraft maintenance, repair and overhaul solutions for business and regional aviation, kicked off 2018 with an implemented maintena...