Jet Aviation Basel recently installed two Rockwell Collins Pro Line 21 Avionic upgrades: one on a Dassault Falcon 2000; the other on a Dassault Falcon 2000EX.
The company has also developed a Pro Line 21 support kit to reduce expected downtime of such installations to six weeks.
“With our Pro Line 21 support kit, we demonstrate our engineering and manufacturing capabilities and our ability to adapt new technologies efficiently.”
Johannes Turzer, senior vice president and general manager of the Maintenance Centre in Basel said: “With our Pro Line 21 support kit, we demonstrate our engineering and manufacturing capabilities and our ability to adapt new technologies efficiently. Reducing required time for supply chain processes clearly benefits our clients by enabling a shorter installation.”
Federal Aviation Administration has closed the G-1 Issue Paper, formally establishing the certification basis for Electra’s EL9 Ultra Short aircraft and advancing the company toward the next big...
Horizon Aircraft has selected BETA Technologies to supply its advanced flight control computers on the Company’s full-scale hybrid-electric VTOL aircraft, the Cavorite X7. Through this...
Rotortrade is strengthening its support capabilities in East Africa through a cooperation with Helicopters International Ltd (“Helint”), an established helicopter maintenance and support p...
SkyDrive announced the conclusion of a MoU with Japan Biz Aviation Co. SkyDrive currently holds a cumulative total of 427 aircraft orders from partners in Japan and overseas (the order...