StandardAero has launched a new, customized accelerated response program to support PT6A turboprop engine operators with hot section inspections, repairs and on-site field services.
This new program — “PT6A FASTLANE™” — includes but is not limited to, on-wing inspections by a certified StandardAero Field Service Representative (FSR), Service Center support and OEM approved repairs. The company chose the termFASTLANE because, in most cases, StandardAero can complete on-wing inspections and most repairs to put operators back in the air within three days (if booked 30 days in advance).
Primary engine models for the FASTLANE program include PT6A-41/-42/-60A/-114A/-135A. Dozens of other PT6A engine models may also apply for the FASTLANE program. With the 30-day advance provision for scheduling the services, StandardAero will guarantee a one-day turnaround time for inspection and two days for engine workscope repairs.
Operators are required to provide StandardAero with engine performance data one week before the scheduled service along with accurate engine logbook information with updated LCF data (times & cycles). In addition, customers’ aircraft must be available when StandardAero’s FSR/Technician arrives onsite along with providing access to proper hangar and support equipment. Certain other conditions/exclusions may apply.
“StandardAero has successfully applied its FASTLANE concept to several other engine models for the industry,” said Rob Higby, Global Vice President of Sales and Marketing for StandardAero Airlines & Fleets. “We’ve spent months designing this program for PT6A customers and we are ready to deliver our high quality services in an accelerated fashion.”
The Arriel 2K engine that powers Leonardo’s AW09 helicopter, has received its type certificate from EASA. This marks an important milestone towards the entry into service of the AW09, Leonardo&r...
Airbus Helicopters officially delivered the first NH90 Standard 2 to the French Armament General Directorate. This new variant of the NH90 TTH was designed specifically for special operations. Fr...
The groundbreaking event of Liebherr-Aerospace Technology (Shanghai) is a milestone that marks a significant step for Liebherr – one of the world's top three landing gear suppliers with deca...
Gulfstream G700 set a new Los Angeles to Farnborough, England, city pair speed record, completing the 4,740-nautical-mile/8,778-kilometer journey in 8 hours and 27 minutes from takeoff to touchdown. T...