50 SKY SHADES - World aviation news

Boeing 702 Digital Satellite to Boost Connectivity for Intelsat Customers

Download: Printable PDF Date: 01 Oct 2017 06:46 category:
Publisher:
Boeing 702 Digital Satellite to Boost Connectivity for Intelsat Customers - Manufacturer publisher
Tatjana Obrazcova
Country: United States Aircraft: Airplanes

Intelsat 37e designed to adapt to surges in connectivity needs

Boeing has 100 percent satellite launch success rate this year

Boeing has successfully supported seven out of seven satellite launches this year, including today’s launch of a 702 high-throughput digital payload satellite, built for Intelsat.

Intelsat 37e sent and received its first signals from space shortly after it launched today on board an Arianespace Ariane 5 rocket. Once in service, the satellite will deliver high-throughput services to support enterprise, broadband, government and mobility applications in the Americas, Africa and Europe.

“This latest launch is an example of our emphasis on quality and reliability to deliver the right products and capabilities to our customers,” said Paul Rusnock, chairman and CEO, Boeing Satellite Systems International, Inc. “Boeing’s market-leading digital payload technology gives our customers the flexibility to adapt to surges in demand for connectivity when and where it is needed, as well as adapt to any changes in their business needs or missions.”

Intelsat 37e is the second Intelsat EpicNG satellite built by Boeing to launch this year and the fourth Intelsat EpicNG satellite built by Boeing. Intelsat 35e, which launched in July 2017 from Cape Canaveral Air Force Base, Fla., was handed over to the customer last month.



Loading comments for Boeing 702 Digital Satellite to Boost Connectivity for Intelsat Customers...


Recommended

Brexit: 28% of European air passengers deprived from compensations

Brexit is almost a year away, but it’s still unclear how the prospective withdrawal will affect British flyers. The current air passenger law protects air travellers against cancelled, delayed a...

St Maarten, St Croix moving forward with airport reconstruction efforts

By Aviation industry analyst Seth Miller Nearly six months after parts of the Caribbean were ravaged by Hurricanes Irma & Maria the situation remains far from normal. Or perhaps it should simpl...

Main rotor blades serial design successfully tested on P2!

SH09 second prototype, P2, has been flying with new main rotor blades that incorporate enhancements to the blade structure and surface finish.  This latest standard, designed for the serie...

Full-Year 2017 results: Airbus overachieved on all key performance indicators

Strong underlying business performance Revenues €67bn; EBIT Adjusted €4.3bn; EBIT (reported) €3.4bn; EPS (reported) €3.71 Proposed 2017 dividend €1.50 per share, up 11...