Aviation news analysis
50 SKY SHADES - World aviation news

Boeing Team Completes KC-46 Tanker Electromagnetic Testing

Download: Printable PDF Date: 29 Jul 2017 10:37 category:
Publisher:
Boeing Team Completes KC-46 Tanker Electromagnetic Testing - Manufacturer publisher
Tatjana Obrazcova
Country: United States Aircraft: Airplanes

A Boeing-led team, including U.S. Air Force and Naval Air Systems Command representatives, recently completed KC-46 tanker electromagnetic testing.

This testing evaluates the aircraft’s ability to safely operate through electromagnetic fields produced by radars, radio towers and other systems under mission conditions.

“The KC-46 tanker is protected by various hardening and shielding technologies designed into the aircraft to negate any effects on the aircraft,” said Mike Gibbons, Boeing KC-46 vice president and program manager. “This successful effort retires one of the key risks on the program.”

Testing was conducted on the Naval Air Station Patuxent River, Md., electromagnetic pulse (EMP) and Naval Electromagnetic Radiation Facility pads and also in the Benefield Anechoic Facility at Edwards Air Force Base, Calif.

During tests on the EMP pad at Patuxent River, the program’s second low-rate initial production KC-46 received pulses from a large coil/transformer situated above the aircraft. The outdoor simulation was designed to test and evaluate the KC-46’s EMP protection while in flight.

The KC-46A is a multirole tanker that is designed to refuel all allied and coalition military aircraft compatible with international aerial refueling procedures and can carry passengers, cargo and patients.

Boeing is assembling KC-46 aircraft at its Everett, Wash., facility.



Loading comments for Boeing Team Completes KC-46 Tanker Electromagnetic Testing...


Recommended

airBaltic Announces First Destinations of Summer 2019

Latvian airlineairBaltic announces its first destination for the summer season of 2019, which will begin in late March. Next season airBalticcontinues to expand its offer in Tallinn, by addi...

VRT500 helicopter passed first stage of aerodynamic tests

The first stage of the aerodynamic tests of the light-weight multi-purpose VRT500 helicopter has been completed at the facilities of the Central Aerohydrodynamic Institute (TsAGI). The aircraft is a n...

Bell 525 completes hot weather testing

The Bell 525 flight test program has now accumulated over 1,000 hours of total test time with speeds exceeding 200kts at maximum gross weight limits. Bell Helicopter is pleased to announce tha...

First ACJ320neo is assembled

Heralds new era in Airbus corporate jets The first ACJ320neo[1] has been assembled on programme, fitted with CFM International LEAP-1A engines and painted in ACJ house-colours, in preparation for a...