50 SKY SHADES - World aviation news

Cirrus Flies First Production Vision Jet

Download: Printable PDF Date: 10 May 2016 04:35 (UTC) categories:
Publisher:
Cirrus Flies First Production Vision Jet - Manufacturer publisher
Tatjana Obrazcova
Aircraft: Airplanes
Source: AIN

P1, the first production version of the Cirrus Vision SF50 single-engine jet, took off from Duluth (Minn.) International Airport on Thursday, flown by test pilot Terry LeSage. “Pilot feedback on P1 is simple,” he said. “The aircraft handled just great. It was not noticeably different from C2 [the third conforming test article], with handling qualities matching those of its predecessors and all systems working as intended.” 

After about 10 days of flying, P1 will be painted and then will fly for another week before undergoing final interior and exterior detailing. FAA certification of the all-composite Vision Jet is planned by the end of next month.

P1’s primary mission will be proving the Vision type-rating training program for approval by the FAA’s Flight Standardization Board. Rob Haig, executive director of flight operations, will oversee development of the training program and Vision instructor pilot training.

The Cirrus backlog is up to more than 600 aircraft and the company is preparing for high-volume production. Major structural components are built at the company’s composites facility in Grand Forks, N.D. then shipped to Duluth for final assembly. P1 is also being used to help prove each step of the design and build process. This includes trimming, drilling, bonding, hardware and systems installation, attaching the wing and stabilizer, engine installation, mounting flight controls and accessories, then painting with the first coat of primer. 

According to Cirrus, “The pace of completing this first production aircraft has been deliberate and steady by design. It is built in tandem with the certification test process and must be proved at each station. The structural components led the way, enduring a long and rigorous testing process before P1’s structures could be built. Next, the airplane moved into testing of the lamination and bonding processes, then systems testing with subsequent installation and addition of components within that area.”

 





Recommended

Dassault Falcon 10X makes maiden flight

Dassault Aviation Falcon 10X has successfully completed its first flight, demonstrating the program’s maturity and marking the launch of the flight test campaign.Test Pilot Sébastien...

High Flying Hangars breaks ground on multi-acre development at Frederick Municipal Airport in Maryland

High Flying Hangars celebrated the groundbreaking event at its development now in progress at the Frederick Municipal Airport in Maryland (KFDK). Frederick City Mayor Michael O’Connor; Airport M...

Lufthansa Technik to build a second base maintenance facility in the Philippines

Lufthansa Technik Philippines, the joint venture between Lufthansa Technik and the MacroAsia Corporation, is significantly expanding its footprint in the Philippines with a new base maintenance facili...

Special Missions Cessna SkyCourier to appear at Farnborough International Airshow

Textron Aviation will return to the Farnborough International Airshow with a Cessna SkyCourier on static display, giving global customers and media an up‑close look at the aircraft’s e...

Android Apps development in Riga, Latvia