50 SKY SHADES - World aviation news

Eve Air Mobility achieves first transition flight milestone, advancing eVTOL program toward wing-borne flight

Download: Printable PDF Date: 03 Aug 2026 18:00 (UTC) categories:
Publisher:
Eve Air Mobility achieves first transition flight milestone, advancing eVTOL program toward wing-borne flight - Manufacturer publisher
Dana Ermolenko
Aircraft: Airplanes

Eve Air Mobility completed its first partial transition flight, marking an important milestone in the development and testing of the company' eVTOL aircraft. The flight involved the activation of the aircraft's rear pusher propeller and thus signified the start of the transition phase from vertical to wing-borne flight. During the test, the aircraft attained a stabilized speed of 27 knots and a maximum ground speed of 30 knots whilst the pusher was activated up to 1,200 RPM. The flight took 3 minutes and 9 seconds, travelled approximately 0.84 nautical miles and attained a maximum height of 90 feet above ground level.

Johann Bordais, chief executive officer of Eve Air Mobility commented: "This first partial transition flight is an important milestone in Eve's development journey. Successfully activating the pusher propulsion system in flight validates a key aspect of our aircraft design and brings us one step closer to delivering safe, efficient and scalable air mobility solutions."

Marcelo Basile, head of engineering at Eve Air Mobility stated: "This flight successfully demonstrated pusher activation in flight and validated key performance targets at the start of the transition phase. The data collected will support continued envelope expansion as we advance toward higher speeds and more complex transition flight testing."

The transition phase is one of the most critical aspects of eVTOL flight, as it involves the aircraft moving from vertical lift to forward flight. The successful completion of this initial partial transition test further advances Eve’s efforts to expand the aircraft’s flight envelope and validate system performance.

Eve’s flight test engineering team is continuing ongoing loads and structural analyses to support future envelope expansion. Following the aircraft’s flight-testing program, the company plans to conduct datalink testing to validate radio link performance and support operations at speeds up to 50 knots.

Over the coming weeks, Eve expects to progressively expand the aircraft’s airspeed envelope, including additional flights with pusher activation as part of the broader transition flight-test campaign.





Recommended

Textron Aviation helps shape tomorrow’s workforce through Kansas’ first aviation youth apprenticeship initiative

As the first aviation company in Kansas to introduce state-registered youth apprenticeships through the Kansas Office of Apprenticeships, Textron Aviation is taking a leading role in workforce develop...

Emirates arrives in Helsinki for the first time

  Emirates has officially inaugurated services to Helsinki, marking a significant milestone in connectivity between Finland and the United Arab Emirates. The new daily route is the only year-r...

CAA Malaysia advances air traffic controller recruitment strategy with Airways International’s SureSelect

Airways International has entered into a new five-year partnership with the Civil Aviation Authority of Malaysia (CAAM), extending the use of its SureSelect air traffic control (ATC) candidate assessm...

From first call to final mission: Helicopter Alliance’s Black Hawks excel throughout fire season

UH-60 Black Hawk helicopters operated by Helicopter Alliance played a vital role in combating wildfires across Central and Southern Europe during the aerial firefighting season that has now concluded....

Android Apps development in Riga, Latvia