Israel's Flying Production has unveiled an upgraded version of its Da Vinci vertical take-off and landing unmanned air vehicle. Dubbed the "Gen B", the development features a Controp electro-optical/infrared sensor and a micro data link.
"The result is a game-changer – we have the only true multi-rotor system that can conduct a real mission in long ranges of 5-10km [radius]," Ofir Zikry, co-founder of the company, tells Flightglobal. The new version is now being tested with a cellular interception payload, developed in Israel. Flying Production has also integrated new, mission-orientated flight modes, including point to target, camera guide and convoy.
Zikry says client feedback is "excellent", and adds: "last month we delivered another nine systems to a eastern European country."
Suitable for use in roles such as urban warfare, special operations,homeland security and civil applications, the Da Vinci has a minimum take-off weight of 12kg (26.4lb), and a maximum payload capacity of 5.6kg. Maximum speed is 24kt (45km/h), and operations can be conducted at up to 2,000ft.
An entire air system can be carried by one person, including a ground control station equipped with software to enable automatic take-off and landing and autonomous flights.
Flying Production
Meanwhile, Zikry reveals the company is developing a long-endurance version of the Da Vinci, which will double the type's maximum flight time from 90min to 3h.
The Metropolitan Washington Airports Authority, United Airlines and the U.S. Department of Transportation announced a landmark transformation for Washington Dulles International Airport with a capital...
Textron Aviation achieved a key milestone as the Cessna Citation CJ3 Gen3 prototype aircraft completed its first flight, advancing the next-generation light jet toward certification. With th...
Gulfstream G700 set a new Los Angeles to Farnborough, England, city pair speed record, completing the 4,740-nautical-mile/8,778-kilometer journey in 8 hours and 27 minutes from takeoff to touchdown. T...
ATP Flight School has reduced the published timeline of its Airline Career Pilot Program by 25% after significantly reducing delays between training completion and FAA practical tests. Students starti...