50 SKY SHADES - World aviation news

Gulfstream Completes Ultimate Load Testing For G500

Download: Printable PDF Date: 16 Jun 2016 19:10 (UTC) categories:
Publisher:
Gulfstream Completes Ultimate Load Testing For G500 - Manufacturer publisher
Tatjana Obrazcova
Country: United States Aircraft: Airplanes

Gulfstream Aerospace Corp. announced it has completed ultimate load testing for the all-new Gulfstream G500.

Ultimate load represents 150 percent of limit load and is equivalent to a 1.5 safety factor specified by the Federal Aviation Administration (FAA) and the European Aviation Safety Agency (EASA). Limit load is the maximum level that an aircraft should experience once during its service life. Completion of the full-scale aircraft ultimate test fulfills the certification requirements for both the FAA and EASA.

Carried out over five months, the testing focused on the aircraft’s fuselage, wing, vertical and horizontal stabilizers and control surfaces. It involved eight primary test conditions, including wing up and down bending, horizontal up and down bending and wing torsion.

More than 6,000 channels of instrumentation, including load cells, strain gages, displacement transducers and instrumented links/pins, were used to monitor the test article’s structural response. Cameras inside the wing, empennage and fuselage allowed engineers and technicians real-time insight into the structure’s behavior.

“This is a significant accomplishment in development of the G500,” said Mark Burns, president, Gulfstream. “The successful completion of these tests confirms the airframe’s solid construction, fulfills certification requirements and clears the way for us to proceed with additional testing.” 

Gulfstream will now conduct an additional company test, applying increasingly higher loads to determine the structural test article’s destruction point. Destructive testing of aircraft components is important to demonstrate and refine Gulfstream’s engineering models, designs and analysis methods.

Later this year, Gulfstream will begin a multi-year fatigue program for the G500 that will simulate three lifetimes of airframe operation.





Recommended

Phillips 66 and United Airlines sign sustainable aviation fuel supply agreement

Phillips 66 and United Airlines have signed an agreement under which Phillips 66 will supply sustainable aviation fuel to United Airlines at Chicago O’Hare International Airport (ORD) and Los An...

Air India discloses 100 Airbus aircraft order and services contract

Tata Group-owned Air India has officially disclosed orders it placed earlier for 10 A350 widebody and 90 single-aisle A320 Family aircraft. In addition, it has selected Airbus&rsqu...

Bombardier celebrated 200th delivery of its Global 7500 aircraft

Bombardier has delivered the 200th Global 7500 business jet to a customer in December. Global 7500 business jet has transformed business aviation with its refined design, unsurpassed pe...

IC Leasing orders second Dassault Falcon 2000LXS

IC Leasing, a Dubai-based business aircraft leasing company, has signed an order for a Dassault Falcon 2000LXS, making it the second Falcon 2000LXS ordered by the company. The latest Falcon 2000LXS is...

Android Apps development in Riga, Latvia