Hartzell Engine Tech received FAA Parts Manufacturer Approval for its Sky-Tec HT starters for Robinson two-place R22 and four-place R44 light utility helicopters. The company’s Sky-Tec HT starter for Lycoming engines features an integrated self-resetting Kickback Protection System (KPS) to protect the powerplant and starter from an engine kickback.
Hartzell Engine Tech President Keith Bagley, commented: “Hartzell Engine Tech’s durable Sky-Tec HT starters with their Kickback Protection System are in full production and available today through the company’s distribution system. They replace our older starters installed by Robinson helicopters at the factory and also older competitor starter units. The Sky-Tec brand, which we acquired in 2016, continues to reflect the highest levels of quality, innovation and value,” he added.
Robinson helicopter operators can check the Hartzell Engine Tech site at Product Lines Lycoming (skytec.aero) to determine if their specific model is covered under the new PMA. To find domestic and international distributors go to Distributors (skytec.aero).
Robinson Helicopter Company in Torrance, Calif. has produced more than 10,000 of the two helicopter models since the R22 was introduced in 1979 and most are still flying today. The PMA for these plug-and-play starters was obtained through the company’s Organization Designation Authorization program.
ST Engineering Commercial Aerospace business has secured a 15-year exclusive MRO contract with Akasa Air for the LEAP-1B engines that power its Boeing 737 MAX fleet. Under the agreement, ST Engin...
Skyports Infrastructure along with SEA Milan and 2i Aeroporti, the leading Italian airport infrastructure investment company controlled by F2i infrastructure funds, today announced the formation...
JCB Aero, an AMAC Aerospace Company, is now operating Maintenance, Repair and Overhaul activities at the hangar in Auch, France, which will allow us to further expand our services and capabilitie...
TARMAC Aerosave inaugurated its 7th maintenance hangar, the 4th at its Teruel site in Spain. Built in the record time of 9 months, its dimensions make it the largest metal-textile hangar in the world....