50 SKY SHADES - World aviation news

Irkut Corporation delivered MC-21 fuselage to TsAGI for static tests

Download: Printable PDF Date: 15 Aug 2016 18:10 (UTC) category:
Publisher:
Irkut Corporation delivered MC-21 fuselage to TsAGI for static tests - Manufacturer publisher
Tatjana Obrazcova
Country: Russian Federation Aircraft: Airplanes

Irkut Corporation delivered to Central AeroHydrodynamic Institute named after professor N.E.Zhukovsky (TsAGI) the MC-21 fuselage designated for static tests to confirm the strength characteristics of the new aircraft and to provide certification of the type for static strength.

On August 12, the MC-21 fuselage was delivered to Zhukovsky from Irkutsk by An-124 freighter. In the near future other parts of the airframe will arrive to TsAGI. In particular, Irkutsk Aviation Plant, a branch of Irkut Corporation where MC-21 fuselage was assembled, will hand over auxiliary power unit compartment.

Irkut Corporation’s specialists, together with the employees of TsAGI and cooperation companies, will perform airframe assembly.

The first stage of the airframe test includes leaks inspection.

Then TsAGI specialists will initiate static tests which include simulation of structural loads in all flight modes with registration of stress-strain state of the aircraft structure.

The purpose of tests comprises experimental verification of static strength, checks of correctness of calculation methods of strength, and fine-tuning of the finite element models based on experimental data.

TsAGI has already conducted tests of a large number of elementary and structurally-similar patterns, including several types of panels, cross and longitudinal joints.

Tests of fuselage compartment, structurally-similar patterns of tail and fin box are being held. The preparation for the isolated testing of composite-made wing box, stabilising fin and high-lift device is being performed.

Ongoing and planned tests are performed to verify the ability of the new MC-21 aircraft structure to perceive design loads without breaking and without receiving unacceptable permanent deformations. This is an important part of a comprehensive test plan, implemented to perform the first flight of MC-21 and its subsequent certification.





Recommended

VINCI Airports announces the most significant investment plan in Edinburgh Airport’s history: £500 million over five years to support its growth

VINCI Airports has announced a landmark £500 million investment programme for Edinburgh Airport over the next five years, marking the largest investment in the airport's history. The initiat...

GE Aerospace names FL Technics Indonesia as first MRO partner for avionics support

FL Technics Indonesia, the first MRO in Indonesia to be appointed as a GE Aerospace avionics support partner, has signed a service support agreement with GE Aerospace covering Boeing 737 and Airbus A3...

German aviation reaches new milestone as Deutsche Aircraft opens D328eco® Final Assembly Line

A new era for German aerospace began today as Deutsche Aircraft officially opened its Final Assembly Line (FAL) at Leipzig/Halle Airport. Joined by senior government representatives Christian Hirte an...

TFC Flight Traininge elevates pilot training journey with new Pipistrel Explorer

TFC Flight Training has become the first flight school in Germany to operate the Pipistrel Explorer following the delivery of two aircraft from Pipistrel, a Textron Inc. company and affiliate of Textr...

Android Apps development in Riga, Latvia