Aviation news analysis
50 SKY SHADES - World aviation news

Kopter is ready for the expansion at Mollis airfield

Download: Printable PDF Date: 13 Feb 2019 03:10 categories:
Publisher:
Kopter is ready for the expansion at Mollis airfield - Manufacturer publisher
Krista Kuznecova
Country: Switzerland Aircraft: Helicopters

Last november citizens of Glarus North voted positive at the municipal assembly last November, so Kopter Group (Kopter) can start its next expansion step.

It has commissioned architect Dima & Partner based in Glarus with the design, planning and construction of a new > 20,000m2 building for its pre-assembly activities at the Mollis airfield. Dima & Partner emerged as the winner of Kopter's call for tender with their project proposal.

The detailed design and planning of this new building will be completed in summer 2019, with the construction due to start in autumn of the same year. After moving into the new building in 2021, Kopter will have the necessary capacities for ramping-up the production of its SH09, a new generation helicopter for the worldwide markets. 

The new building is planned for manufacturing and pre-assembly and will include the production of dynamic components such as rotor blades, gearboxes and rotor heads. Testing rigs and a central warehouse will also be located at this site. Kopter already owns an existing building of 4,200m2 at the Mollis airfield, which will then host the final assembly lines and administrative functions.

This new facility will allow establishing the Mollis site as the company-wide competence center for production, assembly, flight-testing, training and maintenance for the SH09.

Andreas Löwenstein, CEO of the Kopter Group, commented: "We are very pleased with the appointment of Dima & Partner, a well-known local partner with national and international standing, to build our new, state-of-the-art facility, which will allow us to work in the best conditions and to serve our customers worldwide".

The Kopter Group expects to achieve an annual production rate of 50 helicopters in Mollis in the next five years, which will lead to an increase in the number of employees from 100 today to around 400. In addition, the site will manufacture up to 150 further prefabricated sets of subassemblies that will be supplied to the final assembly facilities planned in the US and Asia.



Loading comments for Kopter is ready for the expansion at Mollis airfield...


Recommended

Flying Colours Corp. renews Seletar interiors contract with Bombardier

Flying Colours Corp. is attending this year’s ABACE –  Booth A639 – having confirmed renewal of its agreement with Bombardier Business Aircraft&rsq...

Manta Air chooses safe start with GMA ATR

New domestic carrier of the Republic of Maldives, Manta Air, has signed a Global Maintenance Agreement (GMA) with ATR. This five-year contract covers the Maldivian airline’s full fleet for...

Best Low-Cost Carrier in Europe at 2019 APEX Passenger Choice Awards™ goes to Norwegian

The APEX Passenger Choice Awards is one of the highest accolades in the industry as winners are directly voted by passengers on all aspects of the flight experience, ranging from seat comfort, cabin s...

The sky is the limit for Business Aviation in Asia

The ABACE 2019 is almost behind, so organizers are already looking back, analyzing, thinking of the future edition. They said the growing show pointed to a continual increase in speed and...