50 SKY SHADES - World aviation news

Kopter is ready for the expansion at Mollis airfield

Download: Printable PDF Date: 13 Feb 2019 08:10 (UTC) categories:
Publisher:
Kopter is ready for the expansion at Mollis airfield - Manufacturer publisher
Dana Ermolenko
Country: Switzerland Aircraft: Helicopters

Last november citizens of Glarus North voted positive at the municipal assembly last November, so Kopter Group (Kopter) can start its next expansion step.

It has commissioned architect Dima & Partner based in Glarus with the design, planning and construction of a new > 20,000m2 building for its pre-assembly activities at the Mollis airfield. Dima & Partner emerged as the winner of Kopter's call for tender with their project proposal.

The detailed design and planning of this new building will be completed in summer 2019, with the construction due to start in autumn of the same year. After moving into the new building in 2021, Kopter will have the necessary capacities for ramping-up the production of its SH09, a new generation helicopter for the worldwide markets. 

The new building is planned for manufacturing and pre-assembly and will include the production of dynamic components such as rotor blades, gearboxes and rotor heads. Testing rigs and a central warehouse will also be located at this site. Kopter already owns an existing building of 4,200m2 at the Mollis airfield, which will then host the final assembly lines and administrative functions.

This new facility will allow establishing the Mollis site as the company-wide competence center for production, assembly, flight-testing, training and maintenance for the SH09.

Andreas Löwenstein, CEO of the Kopter Group, commented: "We are very pleased with the appointment of Dima & Partner, a well-known local partner with national and international standing, to build our new, state-of-the-art facility, which will allow us to work in the best conditions and to serve our customers worldwide".

The Kopter Group expects to achieve an annual production rate of 50 helicopters in Mollis in the next five years, which will lead to an increase in the number of employees from 100 today to around 400. In addition, the site will manufacture up to 150 further prefabricated sets of subassemblies that will be supplied to the final assembly facilities planned in the US and Asia.





Recommended

ATR identifies demand for 209 new domestic air routes in Indonesia

ATR identified 209 new domestic air routes in Indonesia that would be economically viable if served by regional turboprop aircraft. Total demand for these routes is 16 million passengers per...

Kaszek makes first aviation AI investment, backing TravelX's trillion-dollar dynamic inventory vision

TravelX announced that Kaszek, Latin America's leading venture capital firm, made a substantial investment in its platform, bringing the company's total funding to $45 million. The invest...

United completes phase one expansion of world's largest pilot training facility

United and CAE celebrated the first phase of expansion at the world's largest pilot training facility, adding 40 new CAE training devices (a combination of full-motion and fixed simulators) since...

Luxaviation UK renews WYVERN WINGMAN status in continued pursuit of safety excellence

Luxaviation UK renewed its WYVERN WINGMAN Certified Operator status, underscoring its ongoing commitment to the highest standards of operational safety and discipline. This certification is upheld thr...

Android Apps development in Riga, Latvia