50 SKY SHADES - World aviation news

Mass production of L-410 NG aircraft should be started in 2017

Download: Printable PDF Date: 30 Sep 2015 11:55 (UTC) category:
Publisher:
Mass production of L-410 NG aircraft should be started in 2017 - Manufacturer publisher
Dana Ermolenko

Certification tests of the new regional aircraft L-410 NG carried out in Kunovice (Czech Republic) will take around 1,5 years, TASS reports with reference to Ural Mining and Metallurgical Company (UMMC), which owns the manufacturer of this aircraft - Aircraft Industries, a.s.

“Testing of the aircraft, its systems and components will take around 1,5 years. The start of its mass production is scheduled for 2017. The company is going to manufacture up to 30 aircraft per year,” the holding company’s press-service noted.

L-410 NG performed its maiden flight in late July 2015. “We have to complete a number of flight tests in order to obtain permission required to launch mass production and start flying in Russia. The aircraft performance is being verified, functionality of control system, engines, fuel system, avionics suite and navigation system is being checked,” the company added.

L-410 NG is the upgraded version of L-410 UVP-E20 aircraft manufactured by Aircraft Industries. Compared to the previous generation the new vehicle’s payload was increased by 400 kg and its front cargo compartment is twice as large as its predecessor’s one. Thanks to larger integrated fuel tanks, which are part of the new wing, the aircraft’s range reached 2 500 km and maximum duration of flight – 10 hours. The engine’s takeoff power increased to 850 h.p.; in addition, the new engine features lower noise level and fuel consumption. The cockpit was also upgraded and fitted with G3000 avionics suite, which is also installed on state-of-the-art passenger aircraft and business jets.

A mock-up of the vehicle’s cabin was presented at Innoporm-2015 exhibition for the first time ever. In early July Chairman of the Russian government Dmitry Medvedev and Vice Premier Dmitry Rogozin inspected the mock-up. “Upgrade of the aircraft took several years; 12 thousand new parts were created. For example, the fuselage is manufactured in Kamensk-Uralskiy. The only thing delivered from USA is engine, but this is less than 10% of the overall parts,” Director of the UMMC legal department Timur Azerniy said.

UMMC purchased 100% of Aircraft Industries’ shares in 2008; 45 L-410 aircraft were delivered to Russia since that time.

UMMC is the Russia’s largest manufacturer of copper. The holding company comprises over 40 enterprises located in 15 regions of Russia, Czech Republic and Serbia. Its staff comprises over 80 thousand employees.





Recommended

Special Missions Cessna SkyCourier to appear at Farnborough International Airshow

Textron Aviation will return to the Farnborough International Airshow with a Cessna SkyCourier on static display, giving global customers and media an up‑close look at the aircraft’s e...

Tecnam appoints Altair Solutions as Official Maintenance, Training and Certified Pre-Owned Partner

Tecnam announced the appointment of Altair Solutions as its Official Maintenance, Training and Certified Pre-Owned Partner, reinforcing its long-standing commitment to customer excellence an...

ProLogium and Elysian Aircraft BV sign MoU to advance the vision of zero-emission aviation

ProLogium announced the signing of a MoU with Elysian Aircraft BV, a Dutch aerospace company developing large-scale battery electric aircraft and core electrification technologies for aviation. U...

flydubai invites Emirati applicants for new Flight Dispatcher Programme

flydubai announced that applications are now open for its newly launched Flight Dispatcher Programme for Emirati talent. Following the MoU signed earlier this year with Emirates Aviation University, t...

Android Apps development in Riga, Latvia