50 SKY SHADES - World aviation news

PART 21 Subpart G approval & launch of final assembly of AURA AERO first series aircraft

Download: Printable PDF Date: 29 Nov 2021 18:10 (UTC) category:
Publisher:
PART 21 Subpart G approval & launch of final assembly of AURA AERO first series aircraft - Manufacturer publisher
Tatjana Obrazcova
Country: France Aircraft: Airplanes

AURA AERO has jusr received Subpart G approval for all of its industrial facilities, an approval mandatory for officially launching serial production of the INTEGRAL family. The PART 21 Subpart G approval was delivered to AURA AERO by Guy Tardieu, president of OSAC, the French authority for civil aviation safety, after 18 months of audit on the Toulouse-Francazal and Bernay (Air Menuiserie) sites, and at the main subcontractors.

This approval certifies that the production of aircraft parts is compliant with their design, and once extended to the whole aircraft, will allow the company to start serial assembly activities, mostly for INTEGRAL R (two-seater, thermic engine, taildragger landing gear), the first of which will be delivered to two French flying clubs, Midi-Pyrénées Voltige and Dijon Voltige.

In the upcoming months, AURA AERO will also begin the production of INTEGRAL S (two-seater, thermic engine, tricycle landing gear) followed by that of INTEGRAL E (two-seater, electric thrust), and finally that of ERA (electric thrust 19 seater for regional transport).

« In the name of the AURA AERO teams, I am very happy to obtain the PART 21 Subpart G approval for our industrial facilities. This approval marks a new milestone in the history of our company and enables us to officially launch serial production of INTEGRAL R, and soon of INTEGRAL E and ERA, taking a step forward towards decarbonated aviation», said Jérémy Caussade, Co-founder and President of AURA AERO.

« This approval validates all of our installation facilities and production processes, which is very important for us as a new aircraft manufacturer, since we can now begin serial production and deliver our first customers. PART 21 Subpart G is hard to obtain, so this is a true recognition of our innovative production system and comforts us as leading industrial company", added Fabien Raison, Co-founder and Chief Operations Officer of AURA AERO.

 

page1image3232256

 



Loading comments for PART 21 Subpart G approval & launch of final assembly of AURA AERO first series aircraft...


Recommended

The D328 uplift research aircraft was officially presented to the public in its new livery

At the National Aviation Conference 2023 in Hamburg, Deutsche Aircraft, in cooperation with the German Aerospace Center, German Aerospace Industries Association and the German government, present...

J&C Aero completes cabin modification and refurbishment of Ukraine presidential Airbus A319

J&C Aero recently completed a major refurbishment project under which it provided cabin modification and renewal services for a state air company “Ukraine”. The company operates a...

VoltAero performed world first flight of an electric-hybrid aircraft with 100% SAF by TotalEnergies

VoltAero has flown the proprietary electric-hybrid powertrain for its Cassio family of aircraft with 100% sustainable fuel provided by TotalEnergies. Conducted from VoltAero development faci...

GKN Aerospace Malaysian engines parts repair facility earns key certifications

GKN Aerospace engines parts repair facility in Johor, Malaysia, has achieved a series of landmark certifications. The Malaysian facility has recently received official approvals from internationa...

Mobile Apps development The drones news