50 SKY SHADES - World aviation news

Second Lockheed Martin Satellite Assembled, Ready to Begin Environmental Testing

Download: Printable PDF Date: 26 Jun 2017 09:38 category:
Publisher:
Second Lockheed Martin Satellite Assembled, Ready to Begin Environmental Testing - Manufacturer publisher
Tatjana Obrazcova
Country: United States

In a specialized cleanroom designed to streamline satellite production, Lockheed Martin is in full production building GPS III – the world's most powerful GPS satellites. The company's second GPS III satellite is now assembled and preparing for environmental testing, and the third satellite is close behind, having just received its navigation payload.

In May, the U.S. Air Force's second GPS III satellite was fully assembled and entered into Space Vehicle (SV) single line flow when Lockheed Martin technicians successfully integrated its system module, propulsion core and antenna deck. GPS III SV02 smoothly came together through a series of carefully-orchestrated manufacturing maneuvers utilizing a 10-ton crane.

GPS III SV02 is part of the Air Force's next generation of GPS satellites, which have three times better accuracy and up to eight times improved anti-jamming capabilities. Spacecraft life will extend to 15 years, 25 percent longer than the newest GPS satellites on-orbit today.

"Now fully-integrated, GPS III SV02 will begin environmental testing this summer to ensure the satellite is ready for the rigors of space," said Mark Stewart, vice president of Navigation Systems for Lockheed Martin. "This testing simulates harsh launch and space environments the satellite will endure, and further reduces any risk prior to it being available for launch in 2018."

A Factory Full of GPS III Satellites

Right behind GPS III SV02, eight more contracted GPS III satellites are moving through production flow at Lockheed Martin's nearly 40,000 sq. ft., state-of-the-art GPS III Processing Facility near Denver.

GPS III SV03 recently completed initial power on of its bus, which contains the electronics that operate the satellite. The company received SV03's navigation payload from its supplier, Harris Corporation, in May. After further system testing, SV03 will be ready for full integration later this fall.

GPS III SV04's major electronics are being populated as it prepares for its own initial power on. This satellite's navigation payload is expected to arrive and be integrated into its space vehicle before the end of the year.

Components of the next six satellites, GPS III SV05-10, are arriving at Lockheed Martin daily from more than 250 suppliers in 29 states. To date, more than 70 percent of parts and materials for SV05-08 have been received. The company was put under production contract for SV09-10 in late 2016.

All of these satellites are now following the Air Force's first GPS III satellite, GPS III SV01, through a proven assembly, integration and test flow. SV01 completed its final Factory Functional Qualification Testing and was placed into storage in February 2017 ahead of its expected 2018 launch.

Investing in the Future of GPS III

With multiple satellites now in production, Lockheed Martin engineers are building GPS III smarter and faster. Key to their success is the company's GPS III Processing Facility, a cleanroom manufacturing center designed in a virtual-reality environment to maximize production efficiency. Lockheed Martin invested $128 million in the new center, which opened in 2011.

The company's unique satellite design includes a flexible, modular architecture that allows for the easy insertion of new technology as it becomes available in the future or if the Air Force's mission needs change. Satellites based off this design also will already be compatible with both the Air Force's next generation Operational Control System (OCX) and the existing GPS constellation.

"From day one, GPS III has been a team effort and our successes would not have been possible without a strong Air Force partnership. GPS III will ensure the U.S. maintains the gold standard for positioning, navigation and timing," said Stewart. "We look forward to bringing GPS III's new capabilities to our warfighters and beginning to launch these satellites in 2018."

The GPS III team is led by the Global Positioning Systems Directorate at the U.S. Air Force Space and Missile Systems Center. Air Force Space Command's 2nd Space Operations Squadron (2SOPS), based at Schriever Air Force Base, Colorado, manages and operates the GPS constellation for both civil and military users.



Loading comments for Second Lockheed Martin Satellite Assembled, Ready to Begin Environmental Testing...


Recommended

CC-130J Super Hercules delivers IRB Commitments for Canada

Lockheed Martin has successfully completed the Aircraft Capability - Tactical (ACP-T) Acquisition Industrial Regional Benefits (IRB) commitments valued at $1.4 billion associated with C...

Australia's Chief of Air Force Completes First Flight in the AIR 5428 PC-21

In a recent ceremony that marked a significant milestone for the AIR 5428 Pilot Training System, Lockheed Martin celebrated the Chief of Air Force first flight of the in-service PC-21 aircraft....

Airbus successfully tests Dispenser Structure for GRACE-FO satellites

Airbus successfully tests the dispenser structure that will hold the twin satellites GRACE-FO (GRACE = Gravity Recovery and Climate Experiment, FO= Follow-On) during their launch. Once the satellites...

Garmin receives EASA approval for new GTN 650/750 features

Garmin is pleased to announce an expanded feature set, an enhanced user interface and additional wireless connectivity solutions for its popular GTN 650/750 touchscreen navigators. New GTN enhancement...

Rolls-Royce Trent 1000 TEN Receives Certification

The Rolls-Royce Trent 1000 TEN, which will power all variants of the Boeing 787 Dreamliner, has been granted full flight certification from the European Aviation Safety Agency (EASA). This important m...

AviaAM Leasing acquires and sells Airbus A321-211

AviaAM Leasing, a Warsaw Stock Exchange listed aircraft leasing company, announced having acquired one Airbus A321 aircraft which was then subsequently delivered to one of its customers under the leas...