50 SKY SHADES - World aviation news

Lufthansa Technik Canada celebrated operational readiness with its first completed engine event

Download: Printable PDF Date: 19 Apr 2026 08:22 (UTC) category:
Publisher:
Lufthansa Technik Canada celebrated operational readiness with its first completed engine event - Maintenance / Trainings publisher
Dana Ermolenko
Country: Canada Aircraft: Airplanes

Lufthansa Technik Canada reached a significant milestone by successfully completing its first live engine event at its interim facility in Calgary. This achievement marks the facility’s full operational readiness and reinforces Lufthansa Technik’s role as a strong and central partner for LEAP-1B engine services in North America.  

The interim facility is now fully operational with a total of eight bays, supporting scalable engine maintenance activities while preparations continue for the future permanent site at Calgary International Airport. Two training engines are currently in the shop, ensuring continous build capability and readiness as operations ramp up. The successful completion of the first LEAP-1B engine event, LTCA’s core specialization, demonstrates the facility’s technical maturity and ability to support customers in North America with high-quality, reliable engine services.

Max Schramm, President & CEO of Lufthansa Technik Canada commented: “With the successful completion of our first engine in Calgary, we are further strengthening our LEAP-1B capabilities in North America. This milestone reflects both the strength of our network and the dedication of our local teams — delivering value closer to our customers.”

Derrick Siebert, Vice President Engine Services at Lufthansa Technik, stated: “Bringing the Calgary facility into live operation is a further step in strengthening our global network for LEAP engine services. It allows us to support our customers in the vicinity of their operation with consistent, high‑quality services while remaining responsive to evolving customer needs across the Americas.”

Continued operations at interim facility while progressing toward the future site

Since announcing its Calgary headquarters in February 2025, Lufthansa Technik Canada has grown to more than 80 employees, reflecting strong momentum and long-term commitment to the Calgary region. In December 2025, LTCA successfully passed its Transport Canada Civil Aviation audit, further confirming regulatory compliance and operational excellence.

Operations will continue at the interim facility while progress advances toward the future permanent site. Lufthansa Technik Canada will develop a 150,000‑square‑foot engine maintenance facility in cooperation with Calgary Airports. It will include Canada’s first test cell for latest‑generation aircraft engines. Construction is scheduled to commence in Q2 2026.

As part of the MES (Mobile Engine Services) network, Lufthansa Technik Canada will play a key role in providing LEAP-1B engine services closer to customers in North America — supporting reduced turnaround times, enhanced operational agility and supply chain resilience.





Recommended

SkyDrive to evaluate potential routes for eVTOL medical logistics in India in partnership with Air India and Suzuki

SkyDrive will move forward with evaluating initial operational routes for the introduction of eVTOL medical logistics services in India, in partnership with Air India and Suzuki. This is part of...

Embraer Phenom 300EV triple certified, first light jet certified with Garmin Emergency Autoland

Embraer Phenom 300EV is now triple‑certified by ANAC, the FAA and EASA — a milestone that makes it the first light jet equipped and certified with Garmin® Emergency Autoland, setting a new b...

NOEMI Aerospace strengthens position in India with SkyHop agreement for up to 15 aircraft

NOEMI Aerospace has formalized a MoU with SkyHop Aviation, India’s first dedicated commercial seaplane operator, paving the way for the deployment of up to 15 NOEMI amphibious aircraft in t...

First fully UK-built Islander since repatriation of production begins ground testing ahead of first flight

Britten‑Norman has reached a major production milestone as the first Islander to be fully manufactured in the UK since the company repatriated its assembly line to Bembridge has now commenced its grou...

Android Apps development in Riga, Latvia