50 SKY SHADES - World aviation news

FIrst U.S.-built Embraer Legacy To Roll Down Line in May

Download: Printable PDF Date: 27 Apr 2016 07:37 (UTC) categories:
Publisher:
FIrst U.S.-built Embraer Legacy To Roll Down Line in May - Manufacturer publisher
Tatjana Obrazcova
Country: United States Aircraft: Airplanes
Source: AIN

The first Embraer Legacy that will be assembled in the U.S.—a Model 450—is expected to start rolling down the line at Embraer Executive Jets’ Melbourne, Fla. final assembly plant in about three weeks, when an expansion project there is completed. This project, started in October 2014, more than doubles the size of the facility, to 149,000 sq ft, allowing Legacy 450 and 500 assembly to be added alongside the current capability to produce Phenom 100s and 300s. All Phenom assembly will also be shifted to the Florida facility as of July 1, Embraer Executive Jets managing director and COO Phil Krull told AIN.

Meanwhile, he said, the fuselage for the Legacy 450 arrived from Embraer’s Faria Lima facility in São José dos Campos, Brazil, earlier this month; the midsize jet’s wings and empennage, built at the company’s Evora factory in Portugal, are scheduled to arrive this week. Krull told AIN that 25 Melbourne employees are now halfway through four weeks of training at the Legacy 450/500 production line in São José dos Campos.

According to Krull, Legacy assembly will start out slow in Melbourne; the first Legacy 450 built there won’t be delivered until mid-December. Two Legacy 450s will first be assembled at the facility, followed by two 500s. After that, this mix will be determined by customer demand, he said. The facility will be able to assemble up to 96 Phenoms and 72 Legacys annually.

There are three other main elements to the expansion project: a new paint facility that can accommodate the Legacy 450/500, a completion center/flight-prep building and a new dedicated delivery center for the Legacy jets. The completion center/flight-prep building is attached to the final assembly facility and will also be finished next month. Structures are currently being raised for the other two buildings, which will be opened later this year.





Recommended

Daher Aircraft expands its authorized service center Network in Brazil, reinforcing support for the country's growing TBM fleet

Daher Aircraft has strengthened its customer support coverage for Brazilian owners and operators of the fast, efficient TBM airplane family with the addition of two authorized service centers to the c...

Where performance meets preparedness — General Aviation Service’s approach to high season success

Summer high season in Spain is always a defining period for general aviation sector, and this year is no exception. With the first two months already behind us, preliminary results are offering a clea...

Why faster diagnostics are becoming critical for aircraft heavy maintenance

For airlines, every additional day an aircraft remains on the ground during heavy maintenance directly impacts operations, schedules, and revenue. As maintenance workloads become more complex and turn...

Liebherr-Aerospace Technology (Shanghai) celebrates groundbreaking

The groundbreaking event of Liebherr-Aerospace Technology (Shanghai) is a milestone that marks a significant step for Liebherr – one of the world's top three landing gear suppliers with deca...

Android Apps development in Riga, Latvia