50 SKY SHADES - World aviation news

Fourth Gulfstream G500 test aircraft completes first flight

Download: Printable PDF Date: 21 Feb 2016 07:24 (UTC) categories:
Publisher:
Fourth Gulfstream G500 test aircraft completes first flight - Manufacturer publisher
Tatjana Obrazcova
Country: United States Aircraft: Airplanes

Gulfstream Aerospace Corp. today announced that the fourth Gulfstream G500 test aircraft, T4, has completed its first flight and officially joined the G500 flight-test program. 

The G500 took off from the Savannah-Hilton Head International Airport at 9:47 a.m. on Saturday, Feb. 20, with Flight Test pilots Eric Holmberg and Brian Dickerson at the controls. Flight Test engineers Dominic Pompeo and Mark Mondt provided on-board test and data analysis.

The aircraft climbed to a maximum altitude of 51,000 feet/15,545 meters and reached a maximum airspeed of 340 KCAS/Mach 0.925. During the 3-hour and 17-minute flight, the crew exercised all primary flight control systems, performed functional checks of air data and cabin pressurization systems and completed a series of engine performance measures. The aircraft landed back in Savannah at 1:04 p.m. local time.

“The first flight of T4 speaks to the growing maturity of the G500 flight-test program and the significant development we completed before we even launched flight test in May 2015,” said Mark Burns, president, Gulfstream. “To have four first flights and more than 580 flight hours in just nine months is quite an accomplishment.”

T4’s first flight represents a milestone in the aircraft’s development program. For the first time, Gulfstream has integrated a team of Product Support maintenance technicians with the Flight Test team to follow the aircraft through manufacturing and flight testing.

“The collaboration between Product Support and Flight Test throughout the G500 certification process will ultimately enhance the support available to operators when the aircraft enters service,” Burns said. “This dedicated service team reflects Gulfstream’s commitment to continuous improvement and ensures we deliver on our promises to customers.”

The integrated team performed all the modifications and testing required to prepare the aircraft for first flight and will continue to lead it through testing in support of Federal Aviation Administration type certification in 2017.

One of five G500 aircraft involved in the flight-test program, T4 will be used to test avionics, flammable fluid drainage, water ingestion and select systems (water/waste, lighting, fire protection). It will also perform flight standardization and operations evaluations. T1 is focused on envelope expansion; T2, on flight loads validation as well as aircraft performance and systems testing; and T3, on the all-new Symmetry Flight DeckTM.

The fifth aircraft, P1, has been delivered to the Savannah Completions Center, where it will become a fully outfitted production aircraft that will be used to test the interior elements as well as the integration of aircraft systems with the passenger experience.





Recommended

FAA certifies Boeing 737-10, bringing the largest 737 MAX variant to market

The U.S. Federal Aviation Administration has certified the Boeing 737-10, the newest and largest member of the 737 MAX family, paving the way for Boeing [NYSE: BA] to begin customer deliveri...

Emirates to introduce latest-generation A350 on Mauritius route from 1 November

Emirates will introduce its latest-generation Airbus A350 on the Dubai-Mauritius route from 1 November 2026, replacing the Boeing 777 currently operating the carrier’s daily EK709/710 service.&n...

Bombardier expands across the Americas, creating thousands of jobs throughout its network and supply chain

Bombardier announced plans to further expand its presence across the United States, with the creation of 800 jobs supported by ongoing growth initiatives and strategic infrastructure investments. ...

MTU Maintenance secures GE90 engine MRO contract with Garuda Indonesia

MTU Maintenance and Garuda Indonesia have entered into a three-year agreement for the maintenance, repair and overhaul of the airline’s GE90-115B engines, which power its fleet of eight Boeing 7...

Android Apps development in Riga, Latvia