The test flight program of the IL-76TD-90VD in Antarctica continues. The aircraft was checked for failure safety during the second phase of tests in November 2016.
The aircraft controls were tested on snow and ice surface with asynchronous traction caused by possible engine failure.

Pilots dealt with interrupted and continued take-offs a snow and ice runway with simulated engine failure, tested the differential brake (braking with only landing gear, positioned on one of the sides of the aircraft), and landing with one inoperative engine (switched to idle).
Tests have confirmed the safety of operation of IL-76TD-90VD in Antarctica in such situations.

Bell Textron announced the Aichi Prefectural Police have officially commenced aerial policing operations utilizing the Bell 505, marking a landmark moment for aviation in the Asia-Pacific region. A ce...
Airbus Helicopters officially delivered the first NH90 Standard 2 to the French Armament General Directorate. This new variant of the NH90 TTH was designed specifically for special operations. Fr...
For airlines, every additional day an aircraft remains on the ground during heavy maintenance directly impacts operations, schedules, and revenue. As maintenance workloads become more complex and turn...
Atoms and Joby Aviation announced a strategic partnership to acquire and develop vertiport sites in the United States. The companies will initially focus on Florida, New York, and Texas, the markets w...