50 SKY SHADES - World aviation news

Air India Dreamliner Grounded for 9 Months, with 400 Parts Missing

Download: Printable PDF Date: 25 Sep 2015 16:15 (UTC) category:
Publisher:
Air India Dreamliner Grounded for 9 Months, with 400 Parts Missing - Airlines publisher
Tatjana Obrazcova
Country: India
Source: WCARN

Air India has kept an aircraft from its prized Dreamliner fleet grounded since January of this year.

According to reports in The Times Of India, the Air India Dreamliner (VT-AND) has been "stripped of parts to keep the other Boeing 787s flying."

The aircraft that costs around Rs 1,400 crore has been grounded as it has around 400 parts missing. There have been problems related to the supply of spare parts and Boeing has still not been able to deliver the necessary fittings, claims the report.

The airline currently has 21 dreamliners in its fleet.

However, this is not the first time an Air India Dreamliner has been grounded. In April 2014, Air India's Boeing 787-8 Dreamliner VT-ANI was grounded for what the airline termed "reliability improvement retrofit (modification)".

Another Air India Dreamliner had to be grounded in Hong Kong (HK) in July 2014 after the aircraft (VT-ANK) sprang an oil leak.

The Dreamliner boasts a state-of the-art in-flight entertainment system, flat-bed recline, reading lamps, large LCD screens and enhanced gaseous filtration system that mitigates dizziness and headaches inside the aircraft.





Recommended

Kepplair Evolution accelerates its growth with a new €6 million funding round, bringing the total funding raised to €17.5 million

Kepplair Evolution, just days after completing the first pre‑modification flights of its prototype aircraft, has announced the closing of a new €6 million funding round — bringing total fin...

Powering privacy in Premium Economy - Emirates unveils the world’s first electric Premium Economy seat with full-height privacy screen

Emirates has further strengthened its leadership in cabin innovation with the introduction of the world’s first electrically powered Premium Economy seat, now entering service on the airline&rsq...

Jet Agent: Why operating history should influence every international aircraft acquisition

Aircraft from emerging markets can represent excellent acquisition opportunities but understanding where and how an aircraft operates should shape the pre-purchase inspection and wider due diligence p...

European approval for production organisation PAL-V

PAL‑V has been granted European Production Organisation Approval (POA), completing the dual automotive and aviation certifications required for large‑scale manufacturing. This authorisation enables PA...

Android Apps development in Riga, Latvia