50 SKY SHADES - World aviation news

Airservices to trial new flight path at Perth Airport

Download: Printable PDF Date: 09 Feb 2016 06:05 (UTC) category:
Publisher:
Airservices to trial new flight path at Perth Airport - Airports / Routes publisher
Tatjana Obrazcova
Aircraft: Airplanes

Some overnight flights taking off to the south on Perth Airport’s Runway 21 will have a new flight path as part of a trial to monitor aircraft noise.

Airservices is conducting the trial over two periods between February and April to compare actual noise levels from the new flight path with noise modelling data that was used in the initial environmental assessment.

Between five and 13 aircraft were expected to use the proposed flight path when taking off on Runway 21 between 2200 and 0500 local time. However, the figure would depend on factors such as weather.

“The short-term change will see some aircraft departing from Runway 21 at Perth Airport between 10 pm and 5 am for destinations to the north and west and continue flying in a straight line without turning until they are adjacent to Jandakot Airport,” Airservices said in a statement on Tuesday.

“They will then turn south-west until they reach 8,000 feet before turning again to continue on to their destinations.”

The proposed flight path trial was scheduled to take place from February 15 to March 6, as well as between March 21 to April 10. Flights taking off on Runway 21 between those two periods would continue to follow existing flight paths.

Noise data will be collected from eight noise monitors located in the suburbs of Langford, Canning Vale, Cockburn Central, Munster, Beeliar and Beaconsfield.

Airservices said on its website noise modelling from an environmental assessment found there would be a four per cent increase in the number of people who would be impacted by aircraft noise if the proposed flight path trial went ahead.

As a result, it had initially decided not to progress with the trial.

However, it had now decided to test the results of its noise modelling after community feedback that noted the four per cent increase “could be considered to be within a typical statistical margin of error” given it was such a small percentage.

“Following the decision to not progress the trial proposal, Airservices received representations from a broad range of stakeholders and believes it is appropriate to validate the results of the modelling by conducting this short study,” Airservices said on its website.

“Notwithstanding our confidence in the Integrated Noise Model, we consider this to be an excellent opportunity to verify its use in this instance.”





Recommended

ATR identifies demand for 209 new domestic air routes in Indonesia

ATR identified 209 new domestic air routes in Indonesia that would be economically viable if served by regional turboprop aircraft. Total demand for these routes is 16 million passengers per...

Do228 NXT makes its African debut at El Alamein Airshow in Egypt and AAD 2026 in South Africa

In September 2026, General Atomics AeroTec Systems will put a major focus on Africa. With two trade show appearances, the German aircraft manufacturer is highlighting the strategic importance of...

Kaszek makes first aviation AI investment, backing TravelX's trillion-dollar dynamic inventory vision

TravelX announced that Kaszek, Latin America's leading venture capital firm, made a substantial investment in its platform, bringing the company's total funding to $45 million. The invest...

Horizon Airways doubles down on fleet modernization with order for second Tecnam P2012 STOL

Queensland-based Horizon Airways has signed an order for a second Tecnam P2012 STOL aircraft. Slated to join the Australian fleet by the end of 2026, this subsequent order rapidly...

Android Apps development in Riga, Latvia