50 SKY SHADES - World aviation news

Deutsche Aircraft and ASE S.p.A. agreement for AC primary power generation & distribution system for D328eco

Download: Printable PDF Date: 16 Jul 2023 07:05 (UTC) category:
Publisher:
Deutsche Aircraft and ASE S.p.A. agreement for AC primary power generation & distribution system for D328eco - Manufacturer publisher
Dana Ermolenko
Aircraft: Airplanes

Deutsche Aircraft and Italian aerospace Italian company ASE S.p.A. announced at the Paris Airshow their new agreement for the AC Primary Power Generation and Distribution Systems for the D328eco, the brand new regional 40-seater sustainable turboprop from Deutsche Aircraft. The AC electrical system from ASE mainly consist of two 25 kVA AC generators, two Generator Control Units and two Primary Power Distribution Unit . The AC Generators are attached to the propeller gear box which provides the appropriate RPM. Each generator is controlled by its generator control unit and outputs the power to the two-channel primary power distribution unit. From there, power is supplied to all AC loads via the secondary power distribution system.

Giuseppe D’Alò, ASE Chief Executive Officer, commented: “We’re proud to announce that we’ve been selected as the AC electrical system supplier for Deutsche Aircraft’s new turboprop D328eco the innovative fixed wing civilian aircraft which is designed to have a lower environmental impact, with comfort and efficiency. 

Fausto Cosentino, ASE Chief Business Officer, stated:“Our AC electrical system will complement the D328eco by being very light, compact and silent. ASE is honored to collaborate with Deutsche Aircraft on such an innovative project. This partnership aligns with our philosophy of care towards the environment and our love for technology.”

Maximillian Fahr ,Deutsche Aircraft Vice President of Supply Chain, said: “ASE is our ideal partner that is prepared to support the D328eco Program with strong project management and integration capabilities across the entire lifecycle of the aircraft. Furthermore, the regional capabilities are a key factor in the supplier selection process along product reliability, and the collaborative approach and experience will ensure compliance with the Program schedule and ramp-up.”

 



Loading comments for Deutsche Aircraft and ASE S.p.A. agreement for AC primary power generation & distribution system for D328eco...


Recommended

MTU Maintenance Hannover completes 10,000th shop visit

MTU Maintenance achieved a historic mark of 10,000 completed shop visits at its Hannover location in Germany, nearly half of the over 22,000 shop visits completed by the MTU Maintenance network.&...

Airbus unveils PioneerLab as its new twin-engine flying laboratory

Airbus Helicopters unveiled the PioneerLab, its new twin-engine technology demonstrator based on the H145 platform. It complements Airbus' range of FlightLabs and focuses on testing technologies t...

Joby delivers first eVTOL aircraft to Edwards Air Force Base ahead of schedule

Joby Aviation has delivered its first aircraft to Edwards Air Force Base approximately six months ahead of the expected 2024 delivery date. On-base operations with Joby aircraft will be used to d...

Embraer and Scoot sign pool program agreement for its E190-E2 fleet

Embraer signed a Pool Program services agreement with Scoot to support the airline’s incoming fleet of nine E190-E2. The Pool Program provides access to component exchanges and repair services f...

Mobile Apps development The drones news